CR 455 Extension PD&E Study

From Schofield Road to Hartwood Marsh Road

 

Study Documents

SECOND PUBLIC HEARING (Held on October 27, 2020)

The Lake County Board of County Commissioners held a second Public Hearing for the CR 455 Extension PD&E Study on October 27, 2020 (as part of the regular Board meeting) in the Lake County Administration Building, Board Chambers (2nd floor), located at 315 W. Main Street, Tavares, Florida 32778.

The Board meeting began at 9:00 a.m. with the CR 455 Extension PD&E Study Public Hearing beginning after this time. The Public Hearing began with a Study presentation followed by oral statements from four speakers. After the Board discussion, the Board voted 4-1 to approve the Recommended Build Alternative with the Neighborhood Recommended Roundabout of the CR 455 Extension PD&E Study. The information shared at the October 27, 2020 Public Hearing is provided below in formats that may either be downloaded or viewed.

Displays in the Rotunda

Welcome Board

Study Area

Presentation Slides

Public Hearing Presenation

Public Hearing Video

Recorded Board of County Commissioners Meeting October 27, 2020

The CR 455 Extension PD&E Study Public Hearing portion begins at 1:34:15 and ends at 2:34:50.

 

UPDATE PRESENTATION (Held on July 21, 2020)

Presentation Slides

Update Presentation Slides July 21, 2020

Board Meeting Video

Recorded Board of County Commissioners Meeting July 21, 2020

The CR 455 Extension PD&E Study portion begins at 2:11:46 and ends at 2:58:23.

 

PUBLIC HEARING (Held on January 28, 2020)


The Lake County Board of County Commissioners held a Public Hearing for the CR 455 Extension PD&E Study on January 28, 2020 (as part of the regularly scheduled Board meeting) in the Lake County Administration Building, Board Chambers (2nd floor), located at 315 W. Main Street, Tavares, Florida 32778. Prior to the Public Hearing, Study information was displayed in the Building's rotunda. Twenty individuals signed in for this Study. Comment forms and speaker cards were provided to attendees. The Board meeting began at 9:00 a.m., with the CR 455 Extension Public Hearing beginning after this time. The Public Hearing began with a Study presentation, followed by oral statements from seven speakers. After the Board discussion, it was decided to postpone the decision-making to a later date in order to allow the Study Team an opportunity to further coordinate with property owners directly impacted by the proposed southern roundabout. The information shared at the January 28, 2020 Public Hearing is provided here in formats that may either be viewed or downloaded. To download Adobe Reader, click here.

Handouts

Comment Form

Speaker Card

Displays in the Building's Rotunda

Welcome Board

Title VI

What is a PD&E Study

Project Schedule and Process

All Build Alternatives

Altenative Evaluation Matrix

Recommended Build Alternative (Purple)

Northern Roundabout

Southern Roundabout

Typical Section

Presentation Slides

Public Hearing Presentation Slides January 28, 2020

Public Hearing Video

Recorded Board of County Commissioners Meeting January 28, 2020

The CR 455 Extension PD&E Study Public Hearing begins at 4:32:45 and ends at 6:09:30.

 

STUDY DOCUMENTS

DRAFT Contamination Report

DRAFT Cultural Resources Technical Memorandum

DRAFT Location Hydraulics Report

DRAFT Natural Resources Evaluation Report

DRAFT Noise Study Technical Memorandum

DRAFT Preliminary Engineering Report

 

MEETING BOARDS, HANDSOUTS, AND PRESENTATIONS

Small Group Meeting | July 2018

Fact Sheet

Welcome Board

Title VI/Non-Discrimination

What is a PD&E Study?

Project Schedule and Process

Main Overall Map

Small Group Meeting Focus Map

Hartwood Marsh Road Improvements Focus Board

Central Florida Expressway Lake/Orange County Connector PD&E Study

Small Group Meeting Map Markups from the Public

Public Meeting | October 2018

Welcome Board

Title VI/Non-Discrimination

What is a PD&E Study?

Project Schedule and Process

Main Overall Map

Small Group Meeting Focus Map

Hartwood Marsh Road Improvements Focus Board

DRAFT 3D Concept Rendering of Proposed Corridor and Privacy Wall

Board of County Commissioners Meeting | June 2019

PowerPoint Presentation

Public Alternatives Workshop | June 2019

Handouts

Fact Sheet (Updated)

Comment Form

Display Boards

Welcome Board

Title VI/Non-Discrimination

What is a PD&E Study?

Project Schedule and Process

Main Exhibit-All Build Alternatives

Blue Alternative (Overall)

Blue Alternative (Flat Lake Residential)

Blue Alternative (Quiet Lane Residential)

Green Alternative (Overall)

Green Alternative (Flat Lake Residential)

Pink Alternative (Overall)

Pink Alternative (Flat Lake Residential)

Purple Alternative (Overall)

Purple Alternative (Flat Lake Residential)

Yellow Alternative (Overall)

Yellow Alternative (Flat Lake Residential)

Evaluation Matrix

Future No-Build Traffic Analysis

Future Build Traffic Analysis

Typical Section

Other Projects: CFX Lake-Orange County Connector

Other Projects: Lake County Wellness Way Area Plan

Alternatives Workshop Presentation

Neighborhood Meeting | September 2019

Preferred Alignment

Proposed Ponds

Optional Ponds

Neighborhood Meeting Presentation

County Commissioners Board Meeting | October 2019

Presentation Slideshow

Preferred Alternative Workshop | October 2019

Welcome Board

Title VI/Non-Discrimination

What is a PD&E Study?

Project Schedule and Process

Main Exhibit-All Build Alternatives

Evaluation Matrix

Future No-Build Traffic Analysis

Future Build Traffic Analysis

Typical Section

Purple Alignment/Preferred Alternative*

Quiet Lane

North Roundabout

South Roundabout

Landscaping

Landscape Renderings

Presentation

*The Hartwood Marsh Road realignment was taken off the exhibit as it is not part of CR 455 Extension Study.

Small Group Meeting | February 2020

Neighborhood Roundabout Alternative